FlowStation AI
Permit compliance pre-checking and coordination
for construction.
Catch compliance issues before the city does.
Then track every fix until the permit is in hand.
Upload drawings. Get a bylaw-cited compliance report in hours—not weeks.
THE PERMITTING CRISIS
A barrier to housing supply in the United States and Canada
UNITED STATES
Estimated U.S. housing shortfall (Freddie Mac, 2024).
Zillow’s 2025 estimate of the U.S. housing shortage.
Of the average new single-family home price (NAHB, 2026).
Added to the average new home by government regulation (NAHB, 2026).
Rise in regulatory costs per new home since 2021 ($93,871 to $131,734).
Construction permit time, NYC (89) & Los Angeles (68) weighted avg., 16 procedures (World Bank, 2020).
Average wait from permit to construction start; 1.0–1.8 months by region (Census SOC, 2025).
Average time to build a single-family home, permit to completion (Census SOC / NAHB, 2025).
Sources: Freddie Mac, Zillow, NAHB, U.S. Census Bureau Survey of Construction, World Bank Doing Business 2020 (2020–2026)
CANADA
Canada ranks second-last for permit approval speed.
3x longer than the U.S. (81 days) for a construction permit.
Major cities vs. regions with affordable housing.
Added to residential construction costs, 2019–2024.
Lowest homes-built-per-person ratio in G7 since 1972.
Major-city condo starts at lowest per-capita since 1996 (H1 2025).
Median permit time for a new house in a major city (down from 43 in 2023).
Same project takes 25–30% longer than 5 years ago.
Sources: World Bank, CMHC, Altus Group, Statistics Canada (2022–2026)
Two audiences. One mission.
FOR BUILDERS, DEVELOPERS & DESIGN TEAMS
Your PM spends 70% of their permit coordination time on tracking, chasing, and checking. FlowStation handles that — from pre-check through every revision cycle until the permit is issued.
FOR MUNICIPALITIES & PLANNING DEPARTMENTS
Reduce your intake backlog. Flowstation pre-screens submissions so your planners spend time on judgement calls, not data entry.
How It Works
UPLOAD DRAWINGS
Plans, specs, site drawings
AI COMPLIANCE SCAN
Checked against your municipality’s exact bylaws
BYLAW-CITED REPORT
Every finding references specific clause
EXPERT REVIEW
An expert validates every output — human in the loop
SUBMIT WITH CONFIDENCE
Clean first submissions. Fewer revision cycles.
AGENT TRACKS REVISIONS
Your team fixes. The agent tracks. Nothing falls through the cracks.
PERMIT ISSUED
Full cycle, closed.
AI Flags. Experts Verify. You Submit.
BYLAW-CITED
Every compliance finding references the exact bylaw subsection. No vague warnings. No black box. You see exactly what we checked and why.
EXPERT-VALIDATED
Every Flowstation report is reviewed by an expert before delivery. Our AI is a tool — professionals make the calls.
NOT A PERMIT DECISION
Flowstation is an advisory pre-check and coordination tool. It does not approve or deny permits. Final authority always rests with your municipality.
Common Questions
Ready to submit cleaner drawings?
Get a bylaw-cited compliance pre-check before your next submission.
Want to reduce your intake backlog?
Start a pilot program funded through available grants.
Book a Municipal Pilot